John Paul, played a crucial role in streamlining the Building Information Modeling (BIM) Interior Fit-Out process for Intel’s data center project in Penang. His expertise in BIM coordination and interior design optimization ensured a seamless execution of the workspace and facility upgrades, aligning with Intel’s high standards for efficiency, functionality, and innovation.
Key Contributions:
BIM Coordination & Clash Detection
Led the 3D modeling and clash detection process to identify and resolve conflicts between architectural, MEP (Mechanical, Electrical, Plumbing), and interior systems before construction, minimizing rework and delays.
Ensured compliance with Intel’s design and safety standards by integrating BIM with facility management requirements.
Space Planning & Layout Optimization
Developed detailed BIM models for interior fit-outs, including server rooms, office spaces, and collaborative work areas, optimizing space utilization for Intel’s operational needs.
Worked closely with architects, engineers, and contractors to ensure seamless integration of IT infrastructure within the interior design.
Material & Cost Efficiency
Utilized BIM for quantity take-offs and material scheduling, reducing waste and improving cost efficiency.
Provided real-time visualization for stakeholders, enabling better decision-making on finishes, furniture, and equipment placement.
Collaboration & Project Delivery
Facilitated multidisciplinary coordination between Intel’s project team, contractors, and vendors to ensure smooth execution.
Supported as-built documentation for future maintenance and facility management.
By leveraging BIM technology, John Paul Bocaya helped Intel’s Penang data center project achieve faster turnaround times, reduced construction risks, and enhanced design accuracy, ensuring a high-quality fit-out that meets Intel’s global standards.